By Eric Engelbert

The Federal Government Gave Tustin 1,600 Acres. Here Is What the City Did With It.

Most large real estate development stories start with a developer buying land. The Tustin Legacy story starts differently. In 2002, the federal government transferred approximately 1,600 acres of former Marine Corps Air Station Tustin to the City of Tustin at no cost. The transaction, known as an Economic Development Conveyance, was structured to allow the city to generate income from land sales and leases to fund the infrastructure needed to develop the site. The city did not pay for the land. It received it. And for the past 25 years, it has been selling parcels to developers, collecting that revenue, and watching one of the largest urban redevelopment projects in Southern California take shape at the intersection of the 5 and 55 freeways.

Tustin Legacy is the name of the project. It is a 1,600-acre master-planned community built on the bones of a military base that trained pilots and housed giant blimp hangars. More than 4,000 homes have already been built and sold. Thousands more are coming. The full vision calls for over 9,000 housing units, major commercial and retail development, parks, schools, and amenities. And two of the most remarkable structures in California still stand on the site, though one of them barely survived a fire that cost the Navy nearly $130 million to clean up.

The Military History: WWII to Base Closure

Marine Corps Air Station Tustin traces its origins to World War II. The Navy constructed two massive blimp hangars on the site beginning in 1942, part of a network of lighter-than-air patrol stations built along both coasts to watch for enemy submarines. Each hangar is approximately 1,000 feet long, 300 feet wide, and 178 feet tall. They are among the largest wooden structures ever built, and they remain among the most visually striking buildings in all of Orange County even decades after the blimps stopped flying.

The base transitioned from Navy to Marine Corps control after the war, serving as a major West Coast helicopter and fixed-wing training facility for decades. At its peak it supported thousands of military personnel and their families and was a significant employer for the surrounding region. The end came in 1993 when the federal Base Realignment and Closure Commission recommended shutting down MCAS Tustin. The base formally closed on July 2, 1999.

When a military installation closes, the federal government determines what happens to the land. In Tustin's case, the city had been preparing since 1992, when it was designated as the Local Redevelopment Authority responsible for planning the base's reuse. The City Council adopted a Reuse Plan in 1996 and spent the next several years working through environmental documentation and land agreements with the Department of the Navy.

The 2002 Conveyance: How the City Got the Land for Free

On May 10, 2002, the City of Tustin and the United States of America executed the Agreement for the Conveyance of a Portion of the Former Marine Corps Air Station Tustin. The instrument used was an Economic Development Conveyance, a mechanism the federal government uses to transfer closed military base land to local governments at below-market or no-cost terms when the transfer will generate economic development and community benefit.

The result was that the City of Tustin received the majority of the 1,600-acre site at effectively no acquisition cost. The city's obligation was to develop the land in accordance with the Reuse Plan and to use the revenue from land sales to fund the infrastructure necessary to support development. In practical terms this meant the city became the land bank: it sells parcels to developers, collects the proceeds, and uses those funds to pay for roads, utilities, parks, and the other improvements that make large-scale development possible.

Compare this to how most California cities handle development. In a typical transaction a private developer buys raw land at market price, pays for infrastructure, builds homes, and sells at a profit. In Tustin Legacy, the city is the seller and the infrastructure funder. The economics are fundamentally different, and they allowed Tustin to plan for a scale and diversity of housing that would have been much harder to achieve through conventional private development.

The 2003 Tustin Legacy Specific Plan set the framework for how it all would be built: phased neighborhoods, a mix of home types and price points, significant commercial and retail development, schools, and a substantial park system across approximately 170 acres of the site.

What Has Been Built: The Completed Neighborhoods

Development at Tustin Legacy has proceeded in phases over more than two decades. The earliest and largest completed villages are known collectively as the Villages of Columbus.

Columbus Square

Columbus Square was developed by Marble Mountain Partners, a joint venture of Lennar Homes and William Lyon Homes. The neighborhood delivered 1,075 housing units plus 240 senior apartments at Coventry Court. It was among the first major phases of Tustin Legacy and established the community's character for subsequent development.

Columbus Grove

Columbus Grove was developed by Moffett Meadows Partners, another Lennar and William Lyon joint venture. It added 465 units to the community. Together Columbus Square and Columbus Grove formed the Villages of Columbus, which completed construction in 2013 and established Tustin Legacy as a viable long-term community destination rather than a speculative land play.

Greenwood in Tustin Legacy

Greenwood opened in 2017 and added 375 modern homes with resort-style amenities including a pool, spa, basketball court, and bocce ball courts. It brought a newer product type to the community and attracted a younger buyer demographic to the Legacy area.

Active Construction: What Is Being Built Now

As of 2026, three major residential projects are in active stages of development or recent completion at Tustin Legacy, plus a large apartment project in the approval and pre-construction phase.

Levity at Tustin Legacy (Lennar)

Levity is Lennar's contemporary urban product at Tustin Legacy, designed by WHA (William Hezmalhalch Architects) and offering three distinct home types at different price points and configurations.

  • Fleet: Three-story townhomes, 1,371 to 2,144 square feet, two to four bedrooms.
  • Velocity: Two and three-story motor court flats, 1,485 to 2,966 square feet.
  • Icon: Three-story detached single-family homes, 1,957 to 2,688 square feet.

Levity opened in 2019 and has been selling through multiple phases. Current pricing reflects significant appreciation over the original launch; expect current market pricing to be meaningfully above original list prices given five-plus years of OC price growth.

The Landing at Tustin Legacy (Brookfield Residential)

The Landing is a 400-home project by Brookfield Residential, the same builder now underway at Gateway Village in Irvine. Brookfield paid approximately $61.5 million for roughly 25 acres for this project, working out to about $2.4 million per acre, giving a sense of how the city's land monetization strategy has played out over time.

  • Terra: Flats and townhomes, 1 to 3 bedrooms, up to 2,275 square feet. Now sold out.
  • Luna: Townhomes, 3 to 4 bedrooms, up to 2,270 square feet, priced from the $900,000s.
  • Cira: Detached homes with private yards, 4 to 5 bedrooms, up to 3,398 square feet, priced from $1.2 million to more than $1.5 million.

Legacy Village (AvalonBay Communities and Abode Communities)

Legacy Village is the most recently approved major project at Tustin Legacy. The City of Tustin entered into an Exclusive Negotiating Agreement with AvalonBay Communities and Abode Communities in May 2022, and the City Council approved the project in February 2025. The project will bring 1,208 apartments to a 19.4-acre site, with 5,000 square feet of retail, 2,500 square feet of coworking space, and 7 acres of private and public open space. One quarter of the apartments are reserved for households earning between 30% and 80% of area median income, making it the most significant affordable housing component of any Tustin Legacy phase to date.

The Blimp Hangars: A $130 Million Fire and an Uncertain Future

No story about Tustin Legacy is complete without the hangars. The two WWII-era blimp hangars that have loomed over the site since 1942 are among the largest wooden structures ever built in the United States. Each is large enough to enclose multiple aircraft carriers. They were a defining landmark of the Tustin skyline for generations, visible from miles away, and for years the question of what to do with them was one of the most contested issues in the entire redevelopment.

The question became dramatically simpler for the North Hangar on November 7, 2023, when a fire ignited inside the structure. The fire burned for 24 days. By the time it was out, the North Hangar was gone. The Navy, which retained responsibility for the site, spent $129.8 million on cleanup, removing more than 549 tons of twisted and charred metal, 77 tons of toxic waste, and over 3,200 tons of nontoxic debris. Air monitoring for asbestos around the site was discontinued in June 2025 after cleanup was completed.

The South Hangar still stands. The City of Tustin is now gathering community input on its future. The options range from preservation and adaptive reuse (suggestions from the public have included a concert hall, a drive-in theater, and an event venue) to demolition and conversion to open space. Neither option is cheap. Routine annual maintenance of the standing structure is estimated at approximately $10 million per year. A full restoration is expected to cost more than $100 million. The city has not announced a final decision.

The Full Vision: 9,000 Homes and Decades Still to Come

Tustin Legacy is not close to finished. The Specific Plan envisions more than 9,000 housing units at full buildout, including single-family detached, attached, multifamily, and more than 975 affordable housing units. Roughly 1,000 of the 1,600 acres have been developed to date, leaving significant land for additional phases of residential, commercial, and community development in the years ahead.

The commercial component is already substantial. The District at Tustin Legacy is an outdoor retail and entertainment center with major anchors and dining. Additional commercial acreage remains in the Specific Plan for future phases. The city also has active land offerings for parcels zoned for retail, service commercial, entertainment, hospitality, office, and research and development, with acreage available now for qualified developers.

For the City of Tustin, the long arc of this project represents an unusual kind of wealth. The federal government delivered the land. The city invested in infrastructure. Developers paid to build. And each phase of completed homes generates property tax revenue, sales tax from retail, and community residents who shop and spend locally. A city that started with a shuttered military base and a blank check of federal land is now one of the more economically dynamic jurisdictions in South Orange County.

Key Dates and Numbers

Milestone Date / Figure
MCAS Tustin base closure July 2, 1999
Federal land conveyance to City of Tustin (no cost) May 10, 2002
Total site acreage 1,600 acres (1,505 Tustin / 95 Irvine)
Total planned housing units 9,000+
Homes built to date (approx.) 4,000+
Brookfield land purchase (The Landing, ~25 acres) $61.5 million (~$2.4M/acre)
North Hangar fire November 7, 2023 (burned 24 days)
Navy cleanup cost (North Hangar) $129.8 million
Legacy Village approval (AvalonBay) February 2025 (1,208 units, 25% affordable)
South Hangar status Standing. Community input underway. Future TBD.

Environmental History: What the Military Left Behind

When the Navy handed over 1,600 acres to the City of Tustin, it also handed over a contamination legacy that is still being addressed today. Military bases by their nature are sites of heavy industrial activity, and MCAS Tustin was no exception. The EPA identified 12 CERCLA remediation sites on the property. Four have been closed. Eight remain under active study and ongoing remediation as of 2026.

The contamination came from three primary sources. The first was pesticides from the base's pre-military life: the land was farmed commercially before 1942, and agricultural chemicals worked their way into the soil and shallow groundwater over decades. The second was solvents and jet fuel from flight operations, including trichloroethene (TCE) and related compounds used in aircraft maintenance. The third, and most significant current concern, is PFAS, a class of man-made chemicals found in the aqueous film-forming foam (AFFF) used for firefighting training and suppression at military bases nationwide.

The Navy began investigating PFAS at the site in 2017 and found it present in the shallow groundwater above EPA drinking water thresholds. The Navy sent letters to homeowner associations in November 2021 notifying them of the finding, which caused significant concern among residents. The city responded with a detailed public FAQ on its website. The key finding: the shallow groundwater at Tustin Legacy is not used for drinking water. All residential water is supplied by the Irvine Ranch Water District from off-site, non-contaminated sources. The city's own testing found no known health risk to residents from current conditions. A workplan for further investigation and potential remediation was approved and work was expected to begin in 2025, with the Navy continuing under oversight of the EPA, the California Department of Toxic Substances Control, and the Santa Ana Regional Water Quality Control Board.

Buyers and residents are encouraged to review the City of Tustin's Environmental Remediation page at tustinca.org for the most current status of all remediation activities, as this is an ongoing and evolving situation.

The Hangar Fire: What Burned, What They Found, and How the Cleanup Worked

When the North Hangar ignited on November 7, 2023, the immediate concern was not just the structure. The hangar was built in 1942, which means it was built with the materials of that era. Asbestos was used extensively as a fireproofing and insulating material throughout the mid-20th century before being banned due to its carcinogenic properties. Lead was also present. Both were now burning or being dispersed as ash and debris across surrounding neighborhoods.

More than 100 firefighters and two water-dropping helicopters initially responded. After assessing the risk that the massive structure would collapse on crews, incident commanders made the decision to pull back and allow the fire to burn rather than fight it from inside or directly beneath it. The fire burned for 24 days. Investigators later determined it was set intentionally.

The South Coast Air Quality Management District deployed air monitoring equipment to fixed stations in the surrounding community. Air samples collected within days of the fire did not detect asbestos at actionable levels. But the debris field was extensive. An investigation by LAist mapped 1,382 locations in nearby neighborhoods where ash and debris from the fire were reported, covering sidewalks, driveways, patios, and yards across a wide radius.

The Navy, as the responsible party under federal environmental law, coordinated the cleanup. Hazardous waste crews spent months combing through affected neighborhoods conducting what is called a Community Cleanup, removing contaminated ash and debris from residential properties. The Navy then funded an additional $15 million for a final stage of community cleanup required by environmental officials. Total Navy expenditures for fire cleanup reached $129.8 million. Air monitoring for asbestos was officially discontinued on June 24, 2025, the Navy's public signal that the environmental response to the fire was complete.

Schools at Tustin Legacy

One of the consistent questions for families considering a move to any new development is what happens with schools. At Tustin Legacy, the answer turned out to be interesting, because the timing of the schools tells its own story about the pace of the buildout.

Heritage Elementary School serves kindergarten through fifth grade at 15400 Lansdowne Road within the Tustin Legacy community. The building was actually completed in 2011, but with home construction stalled during the post-recession slowdown and enrollment numbers too low to justify opening, the school sat largely empty for five years. It finally opened on August 29, 2016, as the Columbus Square and Columbus Grove neighborhoods reached sufficient population. Heritage is part of the Tustin Unified School District.

Legacy Magnet Academy opened in fall 2020 and serves grades 6 through 12. It is built on the Tustin Legacy site and runs a specialized TIDE curriculum: Technology, Innovation, Design, and Entrepreneurship. Students can take dual enrollment coursework through Irvine Valley College, meaning high school students can earn college credit while still on campus. For buyers with school-age children, Legacy Magnet Academy is a genuinely strong offering. It is a magnet school with district-wide open enrollment, so prospective families living elsewhere in Tustin Unified may also apply.

Tustin Legacy is one of many major projects reshaping Orange County. See every city and every development at the New Developments in Orange County page.